Apr 262013
 

Today, the three of us went to Broadwell for a work day there. This was my first time back there in maybe 1 1/2 years making it quite fun for me. After saying hi to Kathy and Constantine, the three of us each took a note from a basket Kathy had prepared for us and on the notes were chores that needed to be done at some point. Alyse drew “plant skunk cabbage”. I’d never heard of something called a skunk cabbage before today so that was fun. Katie drew “mowing” and I drew “clean the dome”. She and I switched because she seemed to want to work on the dome and  I mow a lot so that worked out well. The mowing was a bit more in-depth than I had done before because there were more plants to carefully mow around than what I had done before. I had to really learn to look out for more flowers and such than I usually do but it was good experience because the other people I mow for in my time also have plants that they wouldn’t want mowed over. Besides that, it helped me learn that I need to keep more attention at the task at hand and look out for either flowers or something else in whatever task I’m engaged in and therefore not do something I’m not supposed to do. We also did a few other things like Alyse made some orders that needed done, Katie and I both (but mainly Katie) worked a little with the vermicompost and I moved some dirt that is for an area that Kathy is working on. Also at some point in the day, Kathy went over a thing she has for task evaluation called S.M.A.R.T.. The S being Specific: “is the task a specific mission, over maybe more of a broader request?”. M is Measurable. I don’t exactly remember what this one is for but I think it was something like: “does the task have a measurable outcome, i.e., is it worth doing?”. A is Attainable: “is the given task an attainable one, can it be done?”. R is Relate-able or Relevant: “is the task relate-able to the worker? Can the worker relate to the task and therefore fully understand it?”. And lastly, T for Time Sensitive: “is this task time sensitive? Can it be done in a timely manner?”. I think that that is a good way to look at not just those sorts of task, but lots of other things as well. As a result, I am looking forward to the next time I can go back to Broadwell and do some stuff again.

 Leave a Reply

You may use these HTML tags and attributes: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>

(required)

(required)